Production Module
|
|
|
|
|
#################
|
2012-05-13 23:00:54 +02:00
|
|
|
|
|
|
|
|
The production module defines basics for production management: Bill of
|
|
|
|
|
material and production order.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Bill of Material
|
|
|
|
|
****************
|
|
|
|
|
|
|
|
|
|
Bills of Material are list of products and quantities needed to produce a
|
|
|
|
|
product. It is often shorten with BOM.
|
|
|
|
|
|
|
|
|
|
Production
|
|
|
|
|
**********
|
|
|
|
|
|
|
|
|
|
A Production is mainly defined by a product, a BOM, a location, a quantity and
|
|
|
|
|
two lists of moves:
|
|
|
|
|
|
|
|
|
|
* Inputs
|
|
|
|
|
|
2020-10-12 19:32:02 +02:00
|
|
|
The moves between the production picking location, or the storage location
|
|
|
|
|
if product picking location is empty, and the production location
|
|
|
|
|
(as defined on the warehouse) for products used for production.
|
2012-05-13 23:00:54 +02:00
|
|
|
|
|
|
|
|
* Outputs
|
|
|
|
|
|
2020-10-12 19:32:02 +02:00
|
|
|
The moves between the production location and the production output
|
|
|
|
|
location, or the storage location if production output is empty, for produced
|
|
|
|
|
products.
|
2012-05-13 23:00:54 +02:00
|
|
|
|
|
|
|
|
The production can be in one of this states:
|
|
|
|
|
|
|
|
|
|
* Request
|
|
|
|
|
|
|
|
|
|
The production is requested by the system.
|
|
|
|
|
|
|
|
|
|
* Draft
|
|
|
|
|
|
|
|
|
|
Input and output moves are in draft.
|
|
|
|
|
|
|
|
|
|
* Waiting
|
|
|
|
|
|
|
|
|
|
The production is waiting for action and all moves are still in draft.
|
|
|
|
|
|
|
|
|
|
* Assigned
|
|
|
|
|
|
|
|
|
|
The input moves are assigned.
|
|
|
|
|
|
|
|
|
|
* Running
|
|
|
|
|
|
|
|
|
|
The input moves are in state done.
|
|
|
|
|
|
|
|
|
|
* Done
|
|
|
|
|
|
|
|
|
|
The output moves are in state done.
|
|
|
|
|
|
2020-06-06 10:19:09 +01:00
|
|
|
* Cancelled
|
2012-05-13 23:00:54 +02:00
|
|
|
|
|
|
|
|
All moves are cancelled.
|
|
|
|
|
|
|
|
|
|
The cost of the production is computed with the sum of the cost price of all
|
2019-12-05 22:10:55 +01:00
|
|
|
incoming products. This cost is allocated to the output products based on the
|
|
|
|
|
list price of each (the product without a list price are considered as waste).
|
2020-01-26 15:29:23 +01:00
|
|
|
|
|
|
|
|
A cron task runs every day and updates the cost of productions if the cost
|
|
|
|
|
price of the incoming products has changed.
|
2020-10-12 19:20:21 +02:00
|
|
|
|
|
|
|
|
|
|
|
|
|
Rescheduling Production
|
2020-11-02 17:12:24 +01:00
|
|
|
-----------------------
|
2020-10-12 19:20:21 +02:00
|
|
|
|
|
|
|
|
It is possible to setup a cron task to reschedule the productions that are
|
|
|
|
|
planned to start in the past. By default they are rescheduled to today.
|