As the project doesn't have anymore the same tree structure, it requires to have the duration only of the work but it still needs the total for work reporting. issue4970 review20391003
8 lines
261 B
XML
8 lines
261 B
XML
<?xml version="1.0"?>
|
|
<!-- This file is part of Tryton. The COPYRIGHT file at the top level of
|
|
this repository contains the full copyright notices and license terms. -->
|
|
<tree string="Works">
|
|
<field name="name"/>
|
|
<field name="total_duration"/>
|
|
</tree>
|