Add bullet in doc
This commit is contained in:
1 parent
fba43866a2
commit
96572879cb
1 file changed
+6
-6
+6
-6
@@ -13,22 +13,22 @@ is linked to a warehouse and eventually a supplier, it contains a
|
||||
ideal purchase date and an expected supply date. A purchase request
|
||||
can be in one of these states:
|
||||
|
||||
Draft
|
||||
* Draft
|
||||
|
||||
A draft purchase request is a request that is not linked to a
|
||||
purchase.
|
||||
|
||||
Purchased
|
||||
* Purchased
|
||||
|
||||
A Purchased request is a request that is linked to a purchase which
|
||||
is not in state Done or Cancel.
|
||||
|
||||
Done
|
||||
* Done
|
||||
|
||||
A purchase request is in state Done if it is linked to a Purchase
|
||||
which is in state Done.
|
||||
|
||||
Cancel
|
||||
* Cancel
|
||||
|
||||
A purchase request is in state Cancel if it is linked to a Purchase
|
||||
which is cancelled.
|
||||
@@ -49,14 +49,14 @@ a location. The minimum quantity is the quantity that should be always
|
||||
be reached when re-ordering. An order point also define a type which
|
||||
can be:
|
||||
|
||||
Internal
|
||||
* Internal
|
||||
|
||||
An Internal order point is defined on a Storage location, it also
|
||||
define a provisioning location. If the minimum quantity is reached
|
||||
it will result in the creation of an internal packing between the
|
||||
provisioning location and the Storage location.
|
||||
|
||||
Purchase
|
||||
* Purchase
|
||||
|
||||
A Purchase order point is defined on a warehouse location. If the
|
||||
minimal quantity is reached on the warehouse it will result in a
|
||||
|
||||
Reference in new issue
Block a user